RL.1.1 · Reliability
Perfect Order Fulfillment
96 %
Adverse target gap: 2.0%
Management report / assessment workspace
Manufacturing · Service reliability
Assessment pending
5 of 5 focus KPIs documented · evidence-gated calculations active
Demo · Nordvale Manufacturing (fictional)
Synthetic observations, boundaries and evidence; not real company results. Not saved or transferred.
Precision components · Tartu, Estonia · no real registry code
PDF: choose “Save as PDF” in the print dialog. Excel and JSON contain neutral SCOR data; CBA-RI import format unconfirmed.
100% complete
Results appear only when the evidence is complete. “Undetermined” means something is missing – not a poor result.
5 focus KPI(s) miss their agreed target. Validate the underlying process causes before prioritising interventions.
RL.1.1 · Reliability
96 %
Adverse target gap: 2.0%
RS.1.1 · Responsiveness
6 days
Adverse target gap: 50.0%
AG.1.1 · Agility
18 days
Adverse target gap: 80.0%
CO.1.1 · Cost
110000 currency
Adverse target gap: 10.0%
AM.1.1 · Asset Management Efficiency
45 days
Adverse target gap: 50.0%
01 / CUSTOMER-FACING ATTRIBUTES
Joint attainment uses the approved geometric mean; attribute spread is shown separately. Intersections are conceptual, not numerical scores.
02 / PROCESS PROFILE
No subjective ratings. KPI diagnostics, process/practice evidence and an approved 0–5 rubric are required; zero does not mean missing data.
03 / CONSTRAINTS
Investigate Plan / Source / Make / Deliver. Capacity response → supplier and production constraints. A target miss is not a proven root cause.
Investigate Source / Make / Deliver. Fulfillment cycle components → order-event timestamps. A target miss is not a proven root cause.
Investigate Plan / Source / Deliver / Enable. Inventory, receivables and payables → ledger balances. A target miss is not a proven root cause.
Investigate Plan / Source / Make / Deliver / Return / Enable. Process costs → reconciled transaction records. A target miss is not a proven root cause.
Investigate Source / Make / Deliver. On-time delivery → delivery-date records. A target miss is not a proven root cause.
0 focus KPI evidence gap(s)
04 / ACTION ROADMAP
Confirm reporting scope, measured values, targets and source records.
Suggested owner: Process owners · due date not assigned
Connect Level 1 KPI gaps to Level 2 diagnostics and Level 3 evidence.
Suggested owner: SCOR analyst · due date not assigned
Confirm company boundaries and process evidence; then assign actions, owners and dates.
Suggested owner: Leadership team · due date not assigned
Executive report · APICS SCOR 12.0 (2017)
SYNTHETIC DEMO · Nordvale Manufacturing (fictional) — not real company results
Manufacturing · Service reliability
5 / 5 focus KPIs documented · evidence-gated calculations active
| KPI | Measured | Target | Adverse gap |
|---|---|---|---|
| RL.1.1 · Perfect Order Fulfillment | 96 % | 98 % | 2.0% |
| RS.1.1 · Order Fulfillment Cycle Time | 6 days | 4 days | 50.0% |
| AG.1.1 · Upside Supply Chain Flexibility | 18 days | 10 days | 80.0% |
| CO.1.1 · Total Supply Chain Management Cost | 110000 currency | 100000 currency | 10.0% |
| AM.1.1 · Cash-to-Cash Cycle Time | 45 days | 30 days | 50.0% |
Positive gap = adverse; negative = favourable. Values are reported observations; gaps require source and period. Missing evidence is not poor performance.
Joint attainment uses the approved geometric mean; attribute spread is shown separately. Intersections are conceptual, not numerical scores.
Reliability · Higher is better · Documented, not independently verified
Source: Synthetic order ledger DEMO-ORD-01 · Period: 2026-10-01 / 2026-10-31 (synthetic)
Process links: Source, Make, Deliver. On-time delivery → delivery-date records (illustrative Level 2/3 path).
Responsiveness · Lower is better · Documented, not independently verified
Source: Synthetic order timestamps DEMO-TIME-01 · Period: 2026-10-01 / 2026-10-31 (synthetic)
Process links: Source, Make, Deliver. Fulfillment cycle components → order-event timestamps (illustrative Level 2/3 path).
Agility · Lower is better · Documented, not independently verified
Source: Synthetic capacity scenario DEMO-CAP-01 · Period: 2026-10-01 / 2026-10-31 (synthetic)
Process links: Plan, Source, Make, Deliver. Capacity response → supplier and production constraints (illustrative Level 2/3 path).
Cost · Lower is better · Documented, not independently verified
Source: Synthetic cost ledger DEMO-COST-01 · Period: 2026-10-01 / 2026-10-31 (synthetic)
Process links: Plan, Source, Make, Deliver, Return, Enable. Process costs → reconciled transaction records (illustrative Level 2/3 path).
Asset Management Efficiency · Lower is better · Documented, not independently verified
Source: Synthetic ledger DEMO-CASH-01 · Period: 2026-10-01 / 2026-10-31 (synthetic)
Process links: Plan, Source, Deliver, Enable. Inventory, receivables and payables → ledger balances (illustrative Level 2/3 path).
RL.1.1 · Scope: Fictional Nordvale plant; all in-scope operations · Target: 98 · Worst reference boundary: 88 · Confirmed
RS.1.1 · Scope: Fictional Nordvale plant; all in-scope operations · Target: 4 · Worst reference boundary: 12 · Confirmed
AG.1.1 · Scope: Fictional Nordvale plant; all in-scope operations · Target: 10 · Worst reference boundary: 30 · Confirmed
CO.1.1 · Scope: Fictional Nordvale plant; all in-scope operations · Target: 100000 · Worst reference boundary: 150000 · Confirmed
AM.1.1 · Scope: Fictional Nordvale plant; all in-scope operations · Target: 30 · Worst reference boundary: 90 · Confirmed
Perfect Order Fulfillment; Order Fulfillment Cycle Time; Upside Supply Chain Flexibility; Total Supply Chain Management Cost; Cash-to-Cash Cycle Time Target misses need root-cause investigation; they are not confirmed process bottlenecks.
Confirm measured values, scope, period, targets and evidence records. Suggested owner: Process owners; due date not assigned.
Connect Level 1 gaps to Level 2 diagnostics and Level 3 evidence. Suggested owner: SCOR analyst; due date not assigned.
Confirm company boundaries, evidence and improvement priorities before assigning interventions. Suggested owner: Leadership team; due date not assigned.
| Process | Selected diagnostic KPI links | Score |
|---|---|---|
| Plan | AG.1.1, CO.1.1, AM.1.1 | 4 / 5 |
| Source | RL.1.1, RS.1.1, AG.1.1, CO.1.1, AM.1.1 | 3 / 5 |
| Make | RL.1.1, RS.1.1, AG.1.1, CO.1.1 | 4 / 5 |
| Deliver | RL.1.1, RS.1.1, AG.1.1, CO.1.1, AM.1.1 | 3 / 5 |
| Return | CO.1.1 | 2 / 5 |
| Enable | CO.1.1, AM.1.1 | 5 / 5 |
SCOR 12.0: Plan, Source, Make, Deliver, Return, Enable. SCOR DS: Orchestrate (Level 0); Plan, Order, Source, Transform, Fulfill, Return (Level 1). These editions are not mixed. Metric levels (1–3) are distinct from process hierarchy and maturity.
APICS (2017), SCOR 12.0
https://www.apics.org/docs/default-source/scor-training/scor-v12-0-framework-introduction.pdf?sfvrsn=2
ASCM, SCOR DS process introduction
https://scor.ascm.org/processes/introduction
ASCM, SCOR DS / SCOR 12 crosswalk
https://www.ascm.org/globalassets/ascm_website_assets/docs/scor/scor_crosswalk.pdf
Lichettey Aavik (2024), University of Tartu
https://hdl.handle.net/10062/104894
Lichettey Aavik (2024). Vastutustundliku investeerimise tasuvusanalüüsi mudeli tarkvaratoote loomine (tööstusettevõtte näitel IoT rakendustesse investeerimisel). University of Tartu.
© 2024 Lichettey Aavik — original thesis text, figures and methodological interpretation. SCOR framework content and marks remain with APICS/ASCM. Independent assessment, not official APICS certification.
Neutral SCOR transfer package; automatic CBA-RI import compatibility remains unconfirmed.